Three precautions for welding roller frame installation

Apr 17, 2023پیام بگذارید

(1) Before the equipment is installed, the foundation of the equipment must be done well to ensure the normal maintenance period of the concrete and ensure that the installation orientation of the equipment is on the same horizontal line.
(2) When installing the equipment, fix the equipment according to the installation requirements of general equipment. It can be fixed with expansion bolts (or fixed with a pressure plate). When installing, the two sets of rollers must be placed in parallel, and their centers should be consistent. integrity of each part.
(3) After the equipment is installed, check whether each part of the equipment meets the installation requirements, and ensure the normality of the electrical wiring of each part, check and organize the periphery of the equipment, and ensure that there are no obstacles that affect the normal operation of the equipment. Only after several tasks have been successfully completed can the equipment be powered on and operated.